Which signals come before a change in production?

Industrial forecasting and anomaly detection

Separate sensor faults and regime changes from the process signals that matter, then forecast or monitor them.

Signs this is your problem

  • Sensor exports mix equipment incidents, regime changes and normal variation.
  • A strong association disappears when the period changes.
  • Thousands of variables, little idea which ones matter.

What you receive

  • Cleaned series and documented anomalous periods.
  • Variable selection and interpretable drivers.
  • A forecast or monitoring prototype.

What we check

  • Align timestamps; check sensor coverage, outages and source quality.
  • Detect corrupted periods with IQR, Z-scores, Isolation Forest and change points.
  • Study lagged relationships, seasonality and operating regimes.
  • Validate on later periods and review alerts with operators.

Rigour note. Correlation is not causation. Removed periods must match documented incidents, never inconvenient data.

Featured case study

All case studies →
Energy and industry / IQR

SGTech: finding the signals linked to methane production

More than 10,000 measured variables, structural breaks and equipment incidents. We isolated corrupted periods and identified the signals linked to methane output.

Read the case study
Methane-production signals

Key results

−7% → +71%
correlation with CH4 flow after cleaning
10,000+
variables screened
Funded
additional Ministry of Environment funding

Method notes

What we look at, why, and where the usual methods reach their limits.

Align and audit the signals

Sensors rarely share a clock: sampling rates, time zones and drift differ, and outages leave gaps. Signals are put on a common time grid and a coverage map shows, for each sensor and period, what can be trusted before any relationship is studied.

Tell faults from real changes

Spikes are caught with IQR and Z-score rules, multivariate oddities with Isolation Forest, and regime shifts with change-point detection, Zivot–Andrews then testing for a unit root that allows for the break. Each excluded period is matched to the operating log and reviewed with the operators. At SGTech, removing corrupted periods turned a correlation of −7% with methane output into +71%.

Lags, cycles and regimes

Autocorrelograms and cross-correlations reveal the lead time between a process variable and the output, and seasonality. Stationarity is tested before any regression, following our time-series protocol, so that two trending signals are not mistaken for a relationship.

Forecast or monitor

Forecasts are validated on later periods, never on the data used to build them. Monitoring thresholds are tuned with the operators, who decide how many false alarms are acceptable for how many missed incidents.

Our standard

  • Benchmark first
  • Out of sample
  • Reproducible
  • Limits stated
See our validation standard

To start the conversation

Timestamped sensor data, an equipment or process log, and the horizon or alert you care about.

Custom dashboards

One trusted view of the measures your teams use, with definitions, refresh rules and alerts.

See the service

Questions before we start

How do you tell a sensor fault from a real process change?

With change-point detection, outlier detection and the operating log; Zivot–Andrews then tells whether a series with a break still has a unit root. Every excluded period is documented and reviewed with the operators.

How much history do you need?

Enough to cover the cycles that matter to you. Seasonality and lags are checked with autocorrelograms before any model is fitted.

Raphael Sebbah

Engagements led by Raphael Sebbah, actuary (ISUP) and data scientist, formerly at Amundi (CAAM), Dexia, AIG and Phoenix, co-author of peer-reviewed research.

Let’s build better decisions together

Tell us about the decision you need to make.

A few lines are enough: your sector, the data you have and what you want to improve. We reply personally with a first view of the approach.

  • A few lines are enough
  • NDA on request
  • Code and documentation handed over